Back to Projects
Heavy Construction

Krishna River Flyover Grid

Twin 4-lane flyovers and elevated ramps decongesting the central business district.

Location
Vijayawada · Andhra Pradesh
Client
AP State Roads & Bridges Dept.
Year
2023
Category
Heavy Construction
Status
Completed
Krishna River Flyover Grid
Project estimate

Get your project estimate.

Inspired by the engineering behind Krishna River Flyover Grid? Share your requirements and our pre-construction team will revert within 5 working days with a structured proposal.

Pre-construction & feasibility advisory
Detailed engineering & quantity take-offs
Indicative schedule and budget envelope
Project overview

Scope, engineering & execution.

Scope: Design and construction of twin 4-lane flyovers (1.8 km each), four elevated ramps and 11 km of junction-level road improvements.

Delivered in a live urban envelope through night-shift segmental launching, the project absorbed a 38% spike in daily traffic without imposing detours. Rudra's pre-cast yard produced 1,140 segments delivered just-in-time to the launching crews.

Infrastructure details

Key project specifications.

Flyover Length
2 × 1.8 km
Pre-cast Segments
1,140 nos.
Junction Upgrades
11 km
Peak Workforce
1,200 personnel
Schedule
26 months
Status
Open to Traffic
Business environment

Urban impact, connectivity & logistics.

Urban Decongestion

Cuts CBD peak-hour travel by 32% and removes 9 signal stops.

Commercial Uplift

Improves last-mile access for 4,200 commercial units along the corridor.

Disruption-Free Build

Executed without lane closures using night-shift segmental launching.