Deccan Expressway · Package 3
92 km greenfield 6-lane access-controlled expressway with 14 grade separators.

Get your project estimate.
Inspired by the engineering behind Deccan Expressway · Package 3? Share your requirements and our pre-construction team will revert within 5 working days with a structured proposal.
Scope, engineering & execution.
Scope: EPC contract for design, build and 5-year O&M of a 92 km greenfield expressway with structures, interchanges, ITS and toll plazas.
An access-controlled 6-lane expressway built to IRC: SP-99 standards, featuring intelligent transport systems, automated tolling and rest areas every 40 km. Rudra is deploying paver trains and slip-form barriers to compress the 30-month schedule by 90 days.
Key project specifications.
Urban impact, connectivity & logistics.
Trade Corridor
Halves transit time between Hyderabad and Vijayawada freight terminals.
Industrial Catalyst
Activates three SEZs and unlocks ancillary logistics parks along the route.
Safety Engineering
Median crash barriers, wildlife under-passes and ITS-based incident response.