Deccan Expressway · Package 3

92 km greenfield 6-lane access-controlled expressway with 14 grade separators.

Location
Hyderabad – Vijayawada · Telangana
Client
NHAI · National Highways Authority of India
Year
2025
Category
Highway
Status
In Progress
Deccan Expressway · Package 3
Project estimate

Get your project estimate.

Inspired by the engineering behind Deccan Expressway · Package 3? Share your requirements and our pre-construction team will revert within 5 working days with a structured proposal.

Pre-construction & feasibility advisory
Detailed engineering & quantity take-offs
Indicative schedule and budget envelope
Project overview

Scope, engineering & execution.

Scope: EPC contract for design, build and 5-year O&M of a 92 km greenfield expressway with structures, interchanges, ITS and toll plazas.

An access-controlled 6-lane expressway built to IRC: SP-99 standards, featuring intelligent transport systems, automated tolling and rest areas every 40 km. Rudra is deploying paver trains and slip-form barriers to compress the 30-month schedule by 90 days.

Infrastructure details

Key project specifications.

Length
92 km
Configuration
6-lane access-controlled
Structures
14 interchanges · 38 VUPs
Design Speed
120 km/h
Earthwork
11.4 M m³
Schedule
27 months
Business environment

Urban impact, connectivity & logistics.

Trade Corridor

Halves transit time between Hyderabad and Vijayawada freight terminals.

Industrial Catalyst

Activates three SEZs and unlocks ancillary logistics parks along the route.

Safety Engineering

Median crash barriers, wildlife under-passes and ITS-based incident response.