Konkan Steel Plant · Civil EPC

Heavy civil and structural EPC for a 2.4 MTPA integrated steel plant complex.

Location
Ratnagiri · Maharashtra
Client
Konkan Steel & Alloys Pvt. Ltd.
Year
2024
Category
Industrial
Status
In Progress
Konkan Steel Plant · Civil EPC
Project estimate

Get your project estimate.

Inspired by the engineering behind Konkan Steel Plant · Civil EPC? Share your requirements and our pre-construction team will revert within 5 working days with a structured proposal.

Pre-construction & feasibility advisory
Detailed engineering & quantity take-offs
Indicative schedule and budget envelope
Project overview

Scope, engineering & execution.

Scope: Heavy civil, structural steel erection and utility piping for a 2.4 MTPA integrated steel plant including blast furnace, sinter plant and rolling mill foundations.

Rudra serves as the lead civil EPC partner — handling pile foundations through 38 m strata, 26,000 MT of structural steel erection and turnkey installation of process utilities under a tight 22-month schedule.

Infrastructure details

Key project specifications.

Plant Capacity
2.4 MTPA
Structural Steel
26,000 MT
Piling
4,200 piles · upto 38 m
Concrete
1.8 Lakh m³
Site Workforce
3,800 personnel
Schedule
22 months
Business environment

Urban impact, connectivity & logistics.

Industrial Capacity

Adds 2.4 MTPA of integrated steel output to the western corridor.

Supply-Chain Anchor

Catalyses ancillary fabrication, logistics and port-handling clusters.

Sustainable Build

Closed-loop water systems and waste-heat recovery built into civil design.